Kitchens and baths
Cabinets, counters and tub surrounds come out in a kitchen or bath remodel, along with the floor and wall layers under them. On a job the survey rule covers, all of it is surveyed before the first cut.
Typical cost in Fountain Valley
A survey is the first step for a teardown and for a remodel that opens walls, apart from a renovation under 100 square feet in a single-unit house. Take out a load-supporting wall or beam and Rule 1403 calls the job demolition, and every demolition needs the district notice.
We run the survey, the notice, the containment, the removal and the disposal as one plan. The air test at the end comes from an independent consultant.

Cabinets, counters and tub surrounds come out in a kitchen or bath remodel, along with the floor and wall layers under them. On a job the survey rule covers, all of it is surveyed before the first cut.
Joining two rooms means taking out a wall. If the wall is load-supporting, Rule 1403 calls the work demolition. If it is not, the work is renovation.
A full teardown is surveyed from top to bottom and the district notice goes in before demolition begins. Anything that tests positive is taken out before the building comes down.
Turning a dining room into an office, or a garage into living space, alters ceilings, walls and floors that are surveyed first, as other renovation work is once it passes the small single-unit line.
The notice, the waste and the contractor each have their own rule, and we handle all three with you.
We handle the notice, filing it with the district through its online application and a notification fee, no later than 10 working days before work begins. Renovation removing less than 100 square feet of asbestos-containing material is exempt in any building type, and demolition never is. For a demolition permit, the applicant then gives the building department a copy of that notice, as the district describes state law.
Whether the waste counts as hazardous depends on its state. California’s table lists asbestos at 1 percent, and for asbestos the limit applies only if the substances are in a friable, powdered or finely divided state. Friable asbestos waste is therefore hazardous and moves under a manifest with a licensed hauler.
Credentials are worth checking before any contract is signed. Under Contractors State License Board rules, asbestos work of 100 square feet or more calls for a C-22 Asbestos Abatement classification or a qualifier who passed the ASB exam, and the contractor’s Cal/OSHA registration belongs in that check too.

Smaller jobs begin with asbestos testing, and the home page lists them all.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 251-3218