Example Asbestos Removal Projects in Fountain Valley

The seven example jobs below are set in Fountain Valley, Santa Ana and Tustin. Each one lists what was sampled, what came out, the work days and an estimated cost.

Kitchen ceiling and wall compound removed after the plan check asks about demolition

Example project

Home
Early-1970s two-story house in Fountain Valley with a textured kitchen ceiling and sheet vinyl
Original request
Take out a non-bearing wall between the kitchen and dining room and put in new cabinets
Testing
A Cal/OSHA-certified asbestos consultant samples the ceiling texture, the sheet vinyl and the compound on the wall that comes out
Found
Asbestos in the ceiling texture and the wall compound
Clear
The sheet vinyl
Area
About 150 sq ft of ceiling and 60 sq ft of wall
Timeline
Notice no later than 10 working days ahead, then three working days
Cost
$3,900

Scope of work

Samples of each material, the district notice, the kitchen sealed with air filters running, the texture and the wall compound removed wet, bagging and the haul. The clearance air test, the wall removal and the new cabinets are separate.

Project overview

In this example, a Fountain Valley family is opening up the kitchen of an early-1970s house. The city’s plan check checklist asks whether there will be any type of demolition and says an asbestos survey may be required.

The district’s rule is firmer than the checklist, since it wants a survey before demolition or renovation. The ceiling texture and the wall compound test positive, and the abatement crew removes them before the wall comes down.

The goal

The goal is a kitchen with the positive ceiling and wall material gone before the wall comes out.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling, the floor and the wall.
  2. Before work The abatement contractor files the district notice online while the plans go through plan check.
  3. Days one to three The kitchen is sealed, and the texture and the wall compound come off wet.
  4. Last An independent consultant tests the air before the carpenters start.

Planning right

  • Book the survey when you answer the demolition question.
  • Keep the lab report with the plan check set.
  • Plan meals around a sealed kitchen.
  • Ask the carpenters to wait for the air results.

Get a free quoteMore about renovation and demolition abatement

Floor tile and mastic removed from a front room and hall before plank flooring

Example project

Home
1950s bungalow in Santa Ana with 9-inch tile across the front room and hall
Original request
Lay new plank flooring through the front room and hall
Testing
A Cal/OSHA-certified asbestos consultant samples the tile and mastic at three spots and the compound on the hall wall
Found
Asbestos in the tile and its mastic
Clear
The wall compound
Area
About 210 sq ft of floor
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,900

Scope of work

Samples, the district notice, the two spaces sealed with air filters running, the tile lifted and the mastic removed wet, bagging and the haul. The clearance air test and the new flooring are separate.

Project overview

In this example, a Santa Ana owner is laying plank flooring in the front room and hall of a 1950s bungalow. The tile has been under a rug for years, and the owner wants it sampled before anyone lifts a piece.

The tile and its mastic test positive and the wall compound is clear. The abatement crew removes the tile in one visit, and the flooring crew starts on a clean subfloor.

The goal

The goal is a bare subfloor, so the plank flooring goes on with no positive tile or mastic below it.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the tile where it meets the wall.
  2. Before work The abatement contractor files the district notice online.
  3. Day one The room and hall are sealed, the tile is lifted and the mastic is removed wet.
  4. Day two The subfloor is cleaned and an independent consultant tests the air.

Planning right

  • Please do not lift a tile to look underneath.
  • Take the furniture out of the front room first.
  • Order the flooring for after the air results.

Get a free quoteMore about floor tile and mastic removal

Spray texture removed from a townhouse living and dining ceiling before recessed lights

Example project

Home
1970s townhouse in Tustin with spray texture on the living room and dining room ceiling
Original request
Put in recessed lights and repaint the two rooms
Testing
A Cal/OSHA-certified asbestos consultant samples the texture at three spots
Found
Asbestos in the ceiling texture
Clear
The wall paint and compound
Area
About 230 sq ft of ceiling
Timeline
Notice no later than 10 working days ahead, then two working days
Cost
$2,600

Scope of work

Samples, the district notice, the two rooms sealed with air filters running, the texture soaked and scraped into bags, a HEPA clean and the haul. The clearance air test, the lights and the paint are separate.

Project overview

In this example, a Tustin owner is updating the living and dining rooms of a 1970s townhouse. A townhouse is not a residential single-unit dwelling, so the survey exemption for small single-unit jobs never applies to it.

The texture tests positive. The abatement crew seals the two rooms and removes it, and the electrician cuts in the new lights after the air results.

The goal

The goal is a pair of ceilings free of positive texture, so the new lights go into clean drywall.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling in three places.
  2. Before work The abatement contractor files the district notice online, and the owner lets the neighbors know about the work days.
  3. Day one Both rooms are sealed, and the texture is soaked and scraped off.
  4. Day two The ceilings are wiped down, the bags leave and an independent consultant tests the air.

Planning right

  • Move the dining table and sideboard out of the room.
  • Tell the neighbors which days the crew will be on site.
  • Ask the electrician to start after the air test.

Get a free quoteMore about popcorn ceiling removal

Duct wrap and tape removed where two upstairs bedrooms become one suite

Example project

Home
1970s two-story house in Fountain Valley with a supply duct junction in the attic above the bedrooms
Original request
Join two upstairs bedrooms into a suite, which moves a supply duct
Testing
A Cal/OSHA-certified asbestos consultant samples the wrap at the junction, the tape at three joints and the compound on the wall
Found
Asbestos in the junction wrap and the joint tape
Clear
The wall compound
Area
About 12 ft of duct wrap and three joints
Timeline
Less than 100 square feet of asbestos-containing material removed, so no district notice, then one working day
Cost
$2,100

Scope of work

Samples, plastic around the attic hatch, the wrap and the joint tape removed wet and bagged, a cleanup and the haul. The clearance air test, the new duct run and the carpentry are separate.

Project overview

In this example, a Fountain Valley owner is joining two bedrooms of a 1970s house into a suite. Moving the supply duct is a renovation under the district rule, since removing an HVAC part counts.

The wrap at the junction and the tape at its joints test positive. The abatement crew removes them in one visit, so the heating contractor reroutes the duct without disturbing them.

The goal

The goal is a duct junction free of positive wrap, so the suite work can reroute it safely.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the junction from the attic hatch.
  2. Results The wrap and the tape are positive and the wall compound is clear.
  3. Work day The hatch is sealed, and the wrap and tape come off wet and go into bags.
  4. Then The heating contractor and the carpenter schedule the suite.

Planning right

  • Clear the hall under the hatch.
  • Show the consultant which bedrooms are joining.
  • Keep the report with the heating contractor’s paperwork.

Get a free quoteMore about HVAC duct and pipe insulation removal

Ceiling, floor and wall sampled before a dining room becomes an office

Example project

Home
1970s two-story house in Fountain Valley with a former dining room that is becoming a home office
Original request
Add a wall and a door, built-in shelves and new flooring
Testing
A Cal/OSHA-certified asbestos consultant takes five samples from the ceiling texture, the floor under the carpet and the wall compound
Found
No asbestos in the five samples
Clear
The ceiling, the floor and the wall compound
Timeline
Samples, then lab results, then a short report
Estimated testing cost
$500

Scope of work

A visit by the consultant, five samples, a lab result for each and a short report that records each sample and where it was taken. Any removal would be priced on its own.

Project overview

In this example, a Fountain Valley owner is turning a dining room into an office. The district rule has no build-year cutoff, so a room in a 1970s house is sampled like any other before the carpenter starts.

All five samples come back clear. The report records what was sampled and where, and it covers this room only.

The goal

The goal is a short written record of what the room holds, so the office build-out starts with the facts.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant takes five small samples in the room.
  2. Results The lab reports each sample, and none contains asbestos.
  3. Next The owner hands the report to the carpenter and the flooring installer.
  4. Then Construction starts as planned.

Planning right

  • Please do not take samples yourself.
  • Keep the report with the project file.

Get a free quoteMore about asbestos testing and surveys

Textured stairwell ceiling compound removed before a new light fixture

Example project

Home
1970s two-story house in Fountain Valley with a tall stairwell ceiling sprayed with texture over drywall
Original request
Hang a new pendant light and repaint the stairwell
Testing
A Cal/OSHA-certified asbestos consultant samples the texture and the joint compound at two spots each
Found
Asbestos in the texture and the joint compound
Clear
The drywall paper and the wall paint
Area
About 85 sq ft of ceiling
Timeline
Less than 100 square feet of asbestos-containing material removed, so no district notice, then one working day
Cost
$1,500

Scope of work

Samples, a scaffold, plastic around the stairs and landing, the texture and compound removed wet, bagging, a HEPA clean and the haul. The clearance air test, the light and the paint are separate.

Project overview

In this example, a Fountain Valley owner wants a pendant light over the stairs of a 1970s house. The ceiling is high, and the electrician needs to cut into it.

The texture and the joint compound test positive. The abatement crew works from a scaffold, and the electrician hangs the fixture after the cleanup.

The goal

The goal is a stairwell ceiling free of positive texture, ready for the new fixture and paint.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples the ceiling from a ladder.
  2. Results The texture and the compound are positive, and the drywall paper is clear.
  3. Work day The stairs are sealed in plastic and the ceiling surface is removed wet from the scaffold.
  4. Then The electrician and the painter finish the stairwell.

Planning right

  • Keep the stairs clear of shoes and boxes.
  • Plan which bathroom to use while the stairs are sealed.
  • Ask the electrician to arrive after the cleanup.

Get a free quoteMore about drywall, joint compound and plaster removal

Floor tile under a removed family room bar

Example project

Home
1970s house in Fountain Valley with a built-in bar in the family room
Original request
Remove the bar and lay the same new floor as the rest of the room
Testing
A Cal/OSHA-certified asbestos consultant samples the tile and mastic under the bar and the flooring at the edge of the room
Found
Asbestos in the tile under the bar
Clear
The flooring at the room edge
Area
About 110 sq ft of floor
Timeline
Notice no later than 10 working days ahead, then one working day
Cost
$2,000

Scope of work

Samples, the district notice, the room sealed with air filters running, the tile lifted and the mastic removed wet, bagging and the haul. The clearance air test, taking out the bar and the new floor are separate.

Project overview

In this example, a Fountain Valley owner is taking out a built-in bar and wants the same floor all through the family room. Older tile sits under the bar footprint, and newer flooring covers the rest of the room.

The tile under the bar tests positive and the flooring at the edge is clear. The abatement crew lifts the tile after the bar is out and the area is sealed.

The goal

The goal is one bare subfloor across the family room, so the new floor matches wall to wall.

Process

  1. First visit A Cal/OSHA-certified asbestos consultant samples under the bar and at the room edge.
  2. Before work The abatement contractor files the district notice online.
  3. Work day The room is sealed, the tile is lifted and the mastic removed wet.
  4. Last An independent consultant tests the air before the flooring is installed.

Planning right

  • Empty the bar shelves and cabinets beforehand.
  • Have the bar taken out only after the survey is done.
  • Order the flooring for after the air results.

Get a free quoteMore about floor tile and mastic removal

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 251-3218

Call (657) 251-3218