Vinyl floor tile
We take samples of vinyl and asphalt floor tile room by room. When the lab finds asbestos, the tile is lifted inside containment and bagged for disposal.
Typical cost in Fountain Valley
A lab result comes before any lifting of tile, sheet vinyl or the mastic under them. The district calls floor tile and sheet vinyl resilient floor covering once they contain more than one percent asbestos.
Under carpet or a newer covering there may be an older floor. All layers of flooring materials to the joist level are in the survey, apart from a small single-unit renovation under 100 square feet, and each layer’s lab result drives the plan.

We take samples of vinyl and asphalt floor tile room by room. When the lab finds asbestos, the tile is lifted inside containment and bagged for disposal.
Mastic is sampled in its own right, apart from the tile above it, and a positive result means it comes up too.
Sheet vinyl is sampled the same way. It counts as one more layer of the floor.
Look under the carpet, laminate or vinyl. An older floor may still be down there, and since the rule goes through every layer to the joist level, the survey covers it as well.
A floor job is planned around what the survey finds, not around the room it is in.
Tile beside a utility sink in a garage is surveyed exactly like tile in a kitchen. The survey follows the material, not the room.
Anything standing on the old floor, cabinets, toilets and appliances included, has to be dealt with at some stage, so decide what moves before setup.
Installing the new floor is a separate job after removal, so schedule your installer once the removal work is done.

For walls, see drywall, joint compound and plaster removal, or the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 251-3218