Popcorn Ceiling Removal in Fountain Valley

Typical cost in Fountain Valley

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

A scraper is the last tool to touch a textured ceiling, never the first. We wait for the lab, and if asbestos is found we close the room off, take the texture down and seal the waste for disposal.

Painted texture, patched texture and a ceiling with a water stain all start the same way, with a sample. We plan the removal after the result, around the room and the schedule you have in mind.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and a window looking onto trees.

Ceiling jobs we handle

One room or a whole floor

A bedroom ceiling and a whole upper floor are planned differently, because the area removed decides whether the district notice applies. We measure the ceiling once the lab result is in.

Painted or stained texture

Whether the texture is painted over or carries a water stain, the first step is the same sample, and the removal plan follows its result.

Ceilings that stay

Not every ceiling has to come down. A ceiling that tests free of asbestos, or one nobody is altering, can stay as it is.

Before lights or wall changes

New lights, a removed wall or an opened ceiling all touch the texture. We test first, then say whether the ceiling work should come before the other trades.

Ceiling jobs under 100 square feet

The size of the job decides the notice. Take off less than 100 square feet of asbestos-containing material in a renovation and no district notice is needed, in any type of building, though work practices and waste rules still apply. A demolition is never exempt.

A small job in a residential single-unit dwelling skips the survey rule too, though you still need a test to learn the amount. Townhouses, condominiums and apartment buildings do not count as single-unit dwellings, so there the survey rule still applies.

Texture, then finish

Patching, new texture and paint are separate jobs that come after the removal, so your finisher joins once the asbestos work is done.

Upstairs hall with a textured ceiling, plastic sheeting along the walls and floor, a stair railing and a portable air machine with a hose at the far window.

Floors continue at floor tile and mastic removal; the home page lists the rest.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 251-3218

Call (657) 251-3218