Drywall, Joint Compound and Plaster Removal in Fountain Valley

Typical cost in Fountain Valley

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+

Walls hide their contents until someone opens them. Before a wall is opened or demolished, its drywall, joint compound and plaster, plus the cavity behind them, are sampled, and positive material comes out under containment first. A small renovation of under 100 square feet in a single-unit house skips the survey.

The rule sends sampling into wall and ceiling cavities wherever that is needed to identify what is there, and the lab’s results then drive a room-by-room removal plan.

Request a free quote
Wall cut open around an electrical panel, with plastic sheeting taped to the wall and spread over the wood floor.

What we handle

Joint compound and tape

Taped seams are sampled together with the board behind them. The report gives a result for each material that was sampled, whether drywall, tape or joint compound.

Plaster walls and ceilings

Plaster that will be cut, stripped or taken down is sampled first. If it tests positive, it comes out under containment.

Whole-wall removal

Taking out a wall means taking out everything on it. We survey the full wall, not only the face you can see.

Cut-outs and openings

A panel upgrade, a new window or a widened doorway all disturb the material around the opening, so the survey covers that material before the first cut.

Planning wall work

Other trades cut into walls too, so the survey has to come before they start.

Electricians, plumbers and framers

Anyone who cuts into a wall touches what is inside it. Share the survey report with every trade before setup.

Load-supporting walls

Pulling out a wall that holds up the structure is demolition. That brings the district notice every time.

Patching afterward

Patching and painting are separate from the removal, so your finisher comes in after the asbestos work is done.

Bathroom with wall framing exposed beside a tub, part of the floor tile lifted, plastic hanging at the left and pink and aqua wall tile at the right.

For ducts, see HVAC duct and pipe insulation removal, or the home page.